Projects

Portfolio

Design and implementation of wastewater treatment for Farashib Bana Company

This project is defined as "Design and supervision of engineering, procurement and implementation of a wastewater treatment plant project" for the employer "Farashib Bana Company" and is classified as a non-construction project. The implementation of this project began on 23/12/1402 and is in the completion status according to the recorded information. The contract period has also been announced as 5 months and these records show that the project has progressed within the framework of a specific and documented technical and executive cooperation.

View project

Providing water and wastewater treatment system for Khorasan Steel Complex (Khorasan Steel - Neyshabur)

This project is defined as "Design, supply of equipment, implementation, installation, testing, commissioning, performance assurance and training of reverse osmosis system" for the employer "Iran Alloy Steel Complex" and is classified as non-construction projects. The implementation of this project started on 21/08/1402 and according to the recorded information, it is in the completion status. The contract period has also been announced as 18 months and these records show that the project is within the framework of a specific technical and executive cooperation and

View project

Rador Steel Wastewater Treatment Project (Phase 2)

This project is defined as "Maintenance and operation of sanitary and industrial wastewater treatment system along with studies and re-engineering of industrial treatment plant (compound sampling, testing and analysis and re-engineering of existing treatment plant)" for the employer "Malard Agro-Industrial Complex" and is classified as non-construction projects. The implementation of this project started on 01/06/1401 and according to the registered information, it is in the completion status. The contract period has also been announced as 4 months.

View project

Implementation of the second phase of the Klorpars Company's wastewater treatment system

This project is defined as "Purchase of a two-stage RO device for salt water, along with testing, installation, commissioning and training of the RO device for salt water" for the employer "Pars Chlorine Company" and is classified as a non-construction project. The implementation of this project began on 27/09/1402 and is in the completion status according to the recorded information. The contract period has also been announced as 5 months and these records show that the project is within the framework of a technical cooperation.

View project

Design and implementation of an RO system for producing water with low silica percentage at Pars Shimi Company

This project is defined as "Design, construction, installation and commissioning of a water treatment package with a capacity of 720 cubic meters per day and a pumping station and sanitary wastewater treatment package with a capacity of 7 cubic meters per day" for the employer "Pars Hasti Asia Company" and is classified as a non-construction project. The implementation of this project began on 10/12/2019 and is in the completion status according to the registered information. The contract period has also been announced as 1.5 months and these records show

View project

Implementation of the water supply and wastewater treatment project of the Malard Water and Wastewater Treatment Complex

This project is defined as "Sale of water purification system including Lamellard clarifier pre-treatment unit, UF and reverse osmosis (RO) desalination plant for water production with a capacity of 500 cubic meters per day" for the employer "Mallard Agro-Industrial Complex" and is classified as non-construction projects. The implementation of this project started on 27/07/1401 and according to the registered information, it is in the completion status. The contract period has also been announced as 3 months and these records

View project

Design and construction of an RO unit to supply process water in the Malard Steam Pumping Station project

This project is defined as "Sale of Ultrafiltration (UF) Water Purification System with a capacity of 700 cubic meters per day" for the employer "Malard Agro-Industrial Complex" and is classified as non-construction projects. The implementation of this project began on 30/06/1402 and is in the completion status according to the recorded information. The contract period has also been announced as 3.5 months and these records show that the project has progressed within the framework of a specific and documented technical and executive cooperation.

View project
Shopping Basket