Projects

Portfolio

Implementation of the second phase of the Klorpars Company's wastewater treatment system

This project is defined as "Purchase of a two-stage RO device for salt water, along with testing, installation, commissioning and training of the RO device for salt water" for the employer "Pars Chlorine Company" and is classified as a non-construction project. The implementation of this project began on 27/09/1402 and is in the completion status according to the recorded information. The contract period has also been announced as 5 months and these records show that the project is within the framework of a technical cooperation.

View project

Design and implementation of an RO system for producing water with low silica percentage at Pars Shimi Company

This project is defined as "Design, construction, installation and commissioning of a water treatment package with a capacity of 720 cubic meters per day and a pumping station and sanitary wastewater treatment package with a capacity of 7 cubic meters per day" for the employer "Pars Hasti Asia Company" and is classified as a non-construction project. The implementation of this project began on 10/12/2019 and is in the completion status according to the registered information. The contract period has also been announced as 1.5 months and these records show

View project

Implementation of the water supply and wastewater treatment project of the Malard Water and Wastewater Treatment Complex

This project is defined as "Sale of water purification system including Lamellard clarifier pre-treatment unit, UF and reverse osmosis (RO) desalination plant for water production with a capacity of 500 cubic meters per day" for the employer "Mallard Agro-Industrial Complex" and is classified as non-construction projects. The implementation of this project started on 27/07/1401 and according to the registered information, it is in the completion status. The contract period has also been announced as 3 months and these records

View project

Design and construction of an RO unit to supply process water in the Malard Steam Pumping Station project

This project is defined as "Sale of Ultrafiltration (UF) Water Purification System with a capacity of 700 cubic meters per day" for the employer "Malard Agro-Industrial Complex" and is classified as non-construction projects. The implementation of this project began on 30/06/1402 and is in the completion status according to the recorded information. The contract period has also been announced as 3.5 months and these records show that the project has progressed within the framework of a specific and documented technical and executive cooperation.

View project

Contract for design, engineering and implementation of water supply infrastructure for Bahabad Ferroalloy Plant

This project is defined as "Design, supply and implementation of water supply infrastructure for the Bahabad Ferroalloy Plant, including sanitary wastewater treatment package, reverse osmosis (RO) water treatment, tanks and pumping stations using the non-industrial EPC method" for the employer "Parse Polad Refractory Alloy Company (NAPCO)" and is classified as a non-construction project. The implementation of this project began on 18/10/1403 and is currently in progress according to the registered information. The contract period has also been announced as 6 months, and this

View project

Providing a sanitary wastewater treatment package with a capacity of 50 cubic meters per day

This project is defined as "Supply of sanitary wastewater treatment package with a capacity of 50 cubic meters per day related to the water and wastewater treatment plant construction project" for the employer "Ravar Steel Complex (Kavand Nehan Zamin Company)" and is classified as non-construction projects. The implementation of this project began on 02/06/1401 and according to the recorded information, it is in the completion status. The contract period has also been announced as 1.5 months and these records show that the project is within the framework of a

View project
Shopping Basket